Actions

Ontolog Forum

The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

Ontology Summit 2008 - Content Committee Meeting - Mon 2008-04-21

  • This is the last of the Ontology Summit 2008 Content Committee's weekly information sharing conference calls before the face-to-face. The call is expected to be ~1 Hour.
  • Meeting focus: What to do this week for final preparation for the face-to-face.

Conference Call Details

  • Date: April 21, 2008
  • Start Time: 1:30pm PDT / 4:30pm EDT / 20:30 UTC
  • Expected Call Duration: ~1.0 hours
  • Dial-in Number:
    • Direct call from from Skype: +990008275823120
    • When calling in from a phone, use Conference ID: "5823120#"
    • from a US telephone (US): +1-605-475-8590 (South Dakota, USA)

Attendees

Agenda Ideas

  • (please insert content below; identify yourself for follow-up purposes)
  • Update of topic summary pages
  • Communique input
  • Face-to-face session slides
  • Gap analysis
  • Notification of preparation meeting on Thursday
  • Information sources
  • Resources
  • ...

Proceedings (with last weeks content)

1. Meeting called to order:

2. Attendees:

see above

3. Reports and Discussion:

  • Leo sent out a structure for the champions to provide Communiqué' content.
    • Content should be provided by April 22nd.
  • content champions deliverable-1: Summary pages
    • State-of-Art - work still outstanding
    • Architecture - work still outstanding
    • Quality-Gatekeeping - in great shape
    • Ontology-of-Ontologies - Michael: will not be adding more content, until the F2F discussion; could add that to the page
  • content champions deliverable-2: Summary of each segment for inclusion in the communique
  • content champions deliverable-3: Slides for the F2F workshop presentation
    • let's try to have the slides by the Thu 200804.24 final sync-up call (ref. ConferenceCall_2008_04_24
    • depending on the format each session chair wants to run, this could be a few slides to dozens of slides
  • Gap analysis
    • getting people who have been tracking or synthesizing the conversations to join us on the panel
    • earlier OOR-session panelists are actually fairly well represented at the F2F
    • Tying everything together - the flow in the communique (as discussed earlier and being solicited by Leo & Mark) is doing a good job
  • Notification of preparation meeting on Thursday
  • All suggestions made by the Content Committee for time slots of Monday's sessions were accepted and can be seen at [http://ontolog.cim3.net/cgi-bin/wiki.pl?OntologySummit2008/FaceToFaceAgenda the Face-to-Face Agenda page.
    • Demonstration time will be supported Monday evening via a social/demo gathering at the Holiday Inn.
    • NIST will pay for the gathering room and provide a projector.
    • "Demo teasers" can still be included in the Face-to-Face sessions as determined by the session chair.
  • The Panel Sessions have concluded and still contain a wealth of data to be mined.
    • Michael Grüninger is responding to all questions from the chat area of the Ontology-of-Ontology panel. He is starting threads based on his responses.
    • Michelle Raymond has summarized the two Requirements panels and will post that in two parts: 1) Architecture related summary on the Repository Architectury summary page and 2) as threads to the discussion list.

4. New Issues:

(Method: Email slides to Leo Obrst and PeterYim.)

      • All Content Champions update Summary Pages - Fri, April 18

(Goal: Show a connection with the anticipated direction of the associated face-to-face sessions and the Communique content.)

      • All Content Committee members attend last scheduled Content Committee Meeting before the face-to-face - Mon, April 21

(Goal: Talk/walk through the cohesive story and topic highlights for the face-to-face.)

      • All face-to-face Session Chairs provide workshop session slides - Tue, April 22

(Method: Email slides to Michelle Raymond and PeterYim.)

      • All Content Champions provide Communique content - Tue, April 22

(Method: Email Leo Obrst and MarkMusen.)

      • All attend final review before the face-to-face - Thu, April 24

(Goal: Cover the last minute details.)

5. Any Other Business:

6. Action items:

  • See New Issues above

notes taken by: Peter P. Yim / 2008.04.21-5:12 EDT

All participants, please review and edit to enhance accuracy and granularity of the documented proceedings.